Installation & Commissioning
-
Site Preparation and Installation
-
Preparation
-
This involves ensuring the weighbridge site is level, stable, and meets the necessary dimensions for the specific weighbridge model. Proper drainage and access for vehicles also need to be considered.
-
-
Installation
-
This includes the physical installation of the weighbridge platform, load cells, indicator, and other components. It also involves connecting the necessary cables and ensuring proper alignment and leveling.
-
-
-
Testing and Calibration
-
This is a crucial step where the weighbridge is calibrated using certified test weights to ensure accurate weight readings across the entire platform
-